    摘要:

    为降低大型海上换流站海上安装风险,采用OrcaFlex软件对三峡如东海上换流站的运输和浮托安装的关键阶段进行耦合水动力分析。通过实船监测系统对运输过程中换流站的倾角和加速度,浮托安装过程中的海洋环境条件以及驳船和换流站的运动进行全方位、全过程监测,并将实测结果与数值模拟结果进行对比,二者对比良好,进一步验证了数值计算的可靠性。

    Abstract:

    In order to reduce the risk of offshore installation of large offshore converter station, OrcaFlex software is used to carry out the coupled hydrodynamic analysis of the transportation and the key stages of floatover installation of Sanxia Rudong offshore converter station. Through the real ship monitoring system, the inclination angle and acceleration of the converter station during transportation and the sea environmental conditions and the movement of the barge and converter station during the floatover installation are monitored in an all-round and whole process. The measured results are compared with the numerical simulation results, and the two are well compared, which further verifies the reliability of the numerical calculation.

    参考文献
    相似文献
    引证文献
引用本文

梁富胜,伦灿章,熊根,孙震洲,田新亮,李欣.大型海上换流站浮托安装数值模拟和实测分析[J].中国海洋平台,2023,(04):27-35

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-17
  • 出版日期: