钻井平台推进器系统的安装工艺
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Installation Technology of Propeller System for Drilling Platform
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍一种新型钻井平台推进器系统安装工艺,将其分为舷内部分安装、水下安装以及电动机和浮轴安装等3个阶段。对安装工艺的优化及创新使安装过程更为合理、高效、安全,可保证在较短的时间内成功地完成钻井平台推进器系统的安装工作,同时降低成本、减少安装人员及安装过程中的风险和失误率。安装工艺对于提高我国海洋平台推进器系统的设计、制造和安装水平有重大意义。

    Abstract:

    A new installation technology of the thruster system for drilling platform is introduced. The installation process of the thruster system is divided into three stages: inboard installation, underwater installation, and motor and floating shaft installation. The optimization and innovation of the installation process makes the installation process more reasonable, efficient and safe, so as to ensure the successful installation of the drilling platform thruster system in a relatively short time, and save cost and reduce the installation personnel, risk and error rate of the installation process. It is of great significance to improve the design, manufacture and installation level of marine platform thruster system in China.

    参考文献
    相似文献
    引证文献
引用本文

徐郎君,贺昌海,肖元,高嵩,王海冰,韩彬,侯晓伟.钻井平台推进器系统的安装工艺[J].中国海洋平台,2021,(02):80-85

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-04-23
  • 出版日期: