万吨级导管架建造工艺的实践
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Practice of 10 000 t Jacket Construction Technology
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    海上油气田生产平台的万吨级导管架建造难度大,技术要求和作业风险高。以某海上油气田开发项目的万吨级导管架建造为例,分别对场地区域块布置、模块结构片建造、模块结构片吊装合龙等3个主要的建造步骤进行阐述,并介绍实际应用效果,可为国内外类似导管架或大型基础结构物的设计与建造提供技术支持。

    Abstract:

    It is difficult to construct 10 000 t jacket of offshore oil and gas production platform, which is of high technical requirements and operation risk. The 10 000 t jacket construction of an offshore oil and gas field development project is taken as an example. Three main construction steps, site region block layout, module structure piece construction and module structure piece hoisting closure, are expounded, and the practical application effect is introduced, which can provide the technical support for the design and construction of the similar jacket or large foundation structure at home and abroad.

    参考文献
    相似文献
    引证文献
引用本文

王文龙,林贻海,冯加伟,符秀全.万吨级导管架建造工艺的实践[J].中国海洋平台,2021,(02):71-75

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-04-23
  • 出版日期: