非连续性抛石处理海底管道悬跨原理及施工工艺
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Non-Continuous Rock Dumping Treatment Principle and Construction Process of Subsea Pipeline Free Span
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为解决海洋石油管道工程中海底管道悬跨的问题,阐述非连续性抛石处理海底管道悬跨的原理及施工工艺,该技术通过常规工程船舶搭载石料,采用遥控无人潜水器可操作自卸式抛石漏斗进行抛石作业,采用多点抛料、逐级堆叠的施工工艺完成抛石处理,应用三级校核标准实现抛石质量控制,完成悬跨点抛石支撑。非连续性抛石处理海底管道悬跨施工工艺简单、对作业船要求低、不影响油田生产,而且可靠性高,在费用和效果上都具有较大的应用优势。该方案为处理海底管道悬跨问题提供了新的思路和途径。

    Abstract:

    In order to solve the subsea pipeline free span in offshore oil pipeline engineering, the principle and construction process of non-continuous rock dumping is introduced. The technology is implemented by a conventional engineering vessel that loaded with rock and ROV that handled with self-unloading funnel to dump rock by multipoint material throwing and step-by-step stack construction process, and three-level calibration standard is used to control the rock dumping quality so as to complete the subsea pipeline support. The non-continuous rock dumping method for subsea pipeline free span is simple, of low requirement for vessel and does not affect oilfield operation. It is of high reliability and great application advantages in terms of cost and effect. This method can provide new reference for deep water submarine pipeline free span rectification.

    参考文献
    相似文献
    引证文献
引用本文

叶海宾,张婕,彭海丽,王朋飞,张祥伟.非连续性抛石处理海底管道悬跨原理及施工工艺[J].中国海洋平台,2020,(05):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-11-06
  • 出版日期: