Abstract:Taken a fixed tower cable single point mooring system as the research object, the demolition, lifting and shipment of the system on the sea are analyzed. The clean solution,nondestructive testing method, cutting method and application of tools are illustrated to ensure the safety and reliability of the demolition process.